CASE 9: Vertical Acting without Egress
Corridor Separation
As in the previous case study the requirements of the R-2 occupancy pertaining to corridor rating and vertical space allowance come into play.
As in the previous case study the requirements of the R-2 occupancy pertaining to corridor rating and vertical space allowance come into play.